Kate's Karriage

Restoration Diary

Click on each day's photo for diary details.


first inspection
January 26, 2007:
Found this Jeep on the back lot of a southern Colorado Ranch.
arrival day
March 24, 2007:
Hauled it home on a rainy day and started looking at the details.

without canopy
April 02, 2007:
Peeled off the canopy to start cleaning the inside.
arrival day
April 08, 2007:
Four hours with the pressure washer, and it was still greasy-dirty.

electrolysis
April 21 and 22, 2007:
Gas tank rust removal using electrolysis.
removing body tub
May 04, 2007:
Removing the body.

body tub condition
May 13, 2007:
Body and Frame Condition.
engine head
May 25, 2007:
Parts and Pieces.

painted gas tank
June 03, 2007:
Restoration Begins.
sanded body tub
August 25, 2007:
The Sand Blasted Body Tub.

wirebrushing wheels
September 15, 2007:
Wire Brushing and Priming Wheels.
new hat channel
November 18, 2007:
Welding.

the paintbooth framework
January 12 and April 05, 2008:
Getting Down to Painting.
kate and her karriage
May 27, 2008:
Prepping the body tub for painting.

body tub primed
June 10, 2008:
Body tub priming and painting of first coat of yellow.
yellow tub, first coat
Jun 17, 2008:
Completed first coat of yellow.

sanding painted tub 02
Jul 25, 2008:
Sanding the yellow tub; Sandblasting parts.
sandblasted engine
Aug 24, 2008:
Sandblasting the frame and engine; testing the PTO.

misc parts painted black
Sep 01, 2008:
Painting the frame and miscellaneous parts black.

Once restored to its former farm machine glory,
Kate's Karriage headlight flashing kate's karriage will roam once again on ranch land!
Page created 04/15/2007; modified 11/21/2009
copyright 2007-2009 "webDesign by Ellen"™.